Construction phase

Construction and landing follow-up
1. After the official start of construction, the designer will explain the wall positioning at the site of each of the following important construction nodes | water and electricity location | carpentry approach (Note: travel expenses for site docking of the project are separately included)
2. The designer will also maintain communication with the construction side through wechat, telephone and other ways to answer all kinds of questions about the construction paper. For various difficulties, such as the practice of special technology, the designer will also go to the site to discuss with the construction personnel.

3. If you choose "Design + construction" or "whole case trustement" mode, the designer will follow up the construction progress of the whole site to ensure the landing effect.

About the main material purchase
1. The owner chooses by himself, and the designer will assist in 3 to 5 centralized sample selection procurement to ensure that the shape, texture, texture, color and touch of the selected products are close to the design drawing effect.
2. The designer recommends the main material (optional), are often cooperative manufacturers, with a high degree of cooperation with the designer.
3. If you choose "Design + construction" or "whole case trustement" mode, the main material can be purchased on behalf of the owner.
About soft installation
1. Soft decoration options (furniture, modeling lights, curtains, carpets, green plants, ornaments, etc.)
2. Soft installation list (quantity, specifications, material requirements, etc.)
3. Soft installation (field effect adjustment)
Project shooting | graduation photo


PREVIOUS:Communication phase NEXT:No next

RELATED NEWS

CATEGORIES

CONTACT US

Address: 111 North bridge Road #25-01 Peninsula Plaza Singapore 179098
Phone:+65 85675779
Email:jjin97311@gmail.com